Industry
  • Fossil fuel switch
Continent
  • Asia
Country
  • India
Vintage
  • CP1: 2008-2012
  • CP2: 2013 or later
  • Bank transfer
  • PayPal or Credit Card
Sustainable Development Co-Benefits
Environmental
  • Air
Social
  • Health & Safety
  • Jobs
Economic
  • Energy
  • Technology
Recent project contributors
10/4/2022AU66 t
10/3/2022NL120 t
10/3/2022HU3 t
10/2/2022GB77 t
10/2/2022AU5 t
View all 167

1300

155 MW Gas based combined cycle power project at Hazira

167

The purpose of the project activity is to set up a natural gas based combined cycle power plant (CCPP) through a special purpose vehicle Bhander Power Limited (BPL).
CP1

USD 2.15 per tonne

Serial numberIN: 123923466 - 124066345
Applicable tax rate0 %
ProviderEKI Energy Services Ltd.
Availability75,972 tonne(s)
CP1

USD 2.35 per tonne

Serial numberIN: 174748356 - 174914146
Applicable tax rate0 %
ProviderEKI Energy Services Ltd.
Availability165,620 tonne(s)