Industry
  • Wind
Continent
  • Latin America & the Caribbean
Country
  • Uruguay
Vintage
  • CP2: 2013 or later
  • Bank transfer
Sustainable Development Co-Benefits
Environmental
  • Air
  • Natural resources
Social
  • Jobs
Economic
  • Energy
  • Growth
  • Technology
Recent project contributors
10/17/2023GB652 t
View all 1

9095

Large scale wind farm project "Melowind"

1

The Melowind wind farm, owned by Estrellada S.A., has a capacity of 50MW and consists of 20 Nordex N100 Wind Turbines of 2.5MW of power, a hub height of 80m and a rotor diameter of 100m. The project is located at Km 362 of national route 8, in the Arbolito area, about 40 km from the city of Melo, Cerro Largo, Uruguay.
CP2

USD 1.20 per tonne

Serial numberUY: 1239882 - 1383035
Monitoring period01-05-2014 - 31-08-2020
Applicable tax rate0 %
ProviderEstrellada SA
Availability19,348 tonne(s)
This product has a minimum quantity of 5000
Bank transfer only