6621

Grid connected clean energy project in Jamnagar, Gujar…

From USD 0.55 Available tonnes: 10,000
A wind power project launched in 2013 in Jamnagar, Gujarat, harnesses the power of wind to deliver clean electricity to the national grid. This eco-friendly solution displaces electricity generation from fossil fuel plants, contributing to an annual reduction of approximately 12,371 tons of greenhouse gas emissions. Wind e…

7901

Wind power project in Tamil Nadu by SWPPL

From USD 0.43 Available tonnes: 5,084
The project involves the installation of Suzlon Wind Energy Generators (WEGs) with individual capacities of 1.5 MW and 2.1 MW, located across the Tirunelveli and Tirupur districts in Tamil Nadu, India. The electricity generated will be supplied to the Tamil Nadu Generation and Distribution Corporation Ltd (TANGEDCO) under…

4920

4.5 MW wind power project of PCI Limited at Gujarat, I…

From USD 0.37 Available tonnes: 36,370
The proposed CDM project activity involves the installation and operation of three Wind Electricity Generators (WEGs), each with a capacity of 1.5 MW, resulting in a total wind power generation capacity of 4.5 MW. These WEGs are strategically located in the Surajbari Creek, Village Jangi, Bhachau Taluka, Kutch District, Gu…

8551

Wind power project in Maharashtra by TVS Energy Limite…

From USD 0.35 Available tonnes: 35,412
Green Infra BTV Limited 4 (TVS Energy) develops a 25.5 MW wind farm in the state of Maharashtra, India. The project comprises 17 Wind Electric Generators (WEGs), each with a capacity of 1500 kW. These turbines generate clean and renewable electricity, which is supplied to the Indian grid, supporting the transition toward a…

2365

13.95 MW grid connected wind electricity generation by…

From USD 0.30 Available tonnes: 8,535
The project is spread across two locations – Radhapuram and VK Pudur Taluk, both in Tirunelveli District in Tamil Nadu, India. It involves 6 Wind Turbine Generators (WTGs) where 3 WTGs are of Suzlon and 3 WTGs of Vestas ,with internal electrical lines connecting the project with the local evacuation facility. The project i…