10360

5 MW Solar Power Project by Baba Group

From USD 11.00 Available tonnes: 6,491
The purpose of the project activity is to utilize renewable solar energy for generation of electricity. Dharampal Premchand Ltd. are the promoters of the project which involves the installation of 5 MWp Solar PV power project at village Gaon Talab, Tehsil Ichawar, district Sehore, Madhya Pradesh, India. The project activit…

267

5 MW Wind Power Project at Baramsar and Soda Mada, dis…

From USD 10.00 Available tonnes: 2,933
With over 50 years of experience, Transport Corporation of India Limited is the largest integrated supply chain and logistics solutions provider in India. In 2003, the company entered the energy sector looking to promote non-conventional energy means. Currently, it holds 11.50 MW windmills in Rajasthan and Maharashtra.

7088

SFPL Solar Power CDM Project

From USD 6.00 Available tonnes: 22,903
The purpose of the project is to generate electricity using solar radiation energy to produce eco- friendly power; achieve sustainable development of the industry by reducing CO2 emission and other GHG emissions otherwise likely to be generated due to coal burning to generate power by the Grid based power plants.

9330

Bundled Wind Power Project by Gangamai Industries and…

From USD 4.00 Available tonnes: 71,283
This bundled wind power project has an installed capacity of 10.9 MW in the states of Maharashtra and Rajasthan, India. The annual estimated amount of greenhouse gases reductions obtained from the project activity is 17,321 t CO2e. Its developer is Gangamai Industries and Construction Limited.

5344

Electricity Generation through Wind Power by SRHHL

From USD 4.00 Available tonnes: 3,607
The project activity consists of setting up of Wind Turbine Generators (WTG) of a total capacity of 4.95 MW (1.65 MW x 3 nos.) in Tamil Nadu by Sree Rayalaseema Hi-Strength Hypo Limited, (hereafter referred as SRHHL).

328

Dolowal, Salar and Bhanubhura Mini Hydroelectric Proje…

From USD 4.00 Available tonnes: 4,075
Three Mini Hydroelectric Projects (MHP) aggregating to 4.2 MW at Dolowal, Salar and Bhanubhura on the Kotla Branch Canal, District Sangrur, Punjab, India was commissioned in April 2003. The plants are operating successfully since then.

329

Babanpur, Killa and Sahoke Mini Hydroelectric Projects

From USD 3.75 Available tonnes: 12,315
Three Mini Hydroelectric Projects (MHP) aggregating to 3.75 MW at Babanpur, Killa and Sahoke on the Kotla Branch Canal, District Sangrur, Punjab, India have been set up. Mini Hydroelectric Project at Babanpur (1MW) was commissioned in July 2004, Killa (1.75MW) was commissioned in November 2005 and Sahoke (1MW) was commissi…

2936

24 MW Bhilangana - III Hydro Power Project

From USD 3.75 Available tonnes: 5,719
Bhilangana - III (B-III) is a run-of-the-river 24 MW (consisting 3 units of 8 MW each) Hydro Power Project located at Village Ghuttu, Tehsil Ghansali, District Tehri, Uttarakhand State, India. The project activity contemplates utilization of water of Bhilangana River, a tributary of the river Bhagirathi, for setting up an…