329

Babanpur, Killa and Sahoke Mini Hydroelectric Projects

From USD 3.75 Available tonnes: 12,388
Three Mini Hydroelectric Projects (MHP) aggregating to 3.75 MW at Babanpur, Killa and Sahoke on the Kotla Branch Canal, District Sangrur, Punjab, India have been set up. Mini Hydroelectric Project at Babanpur (1MW) was commissioned in July 2004, Killa (1.75MW) was commissioned in November 2005 and Sahoke (1MW) was commissi…

1904

Avoidance of methane emissions from Municipal Solid Wa…

From USD 3.00 Available tonnes: 33,157
This project activity entails production of organic manure-‘Enrich’ from municipal solid waste (MSW) and food waste (comprising of fish waste and coconut husk) through composting. The same is being developed by Krishi Rasayan Private Limited, the project proponent.

1558

Ratchaburi Farms Biogas Project at SPM Farm

From USD 2.00 Available tonnes: 6,708
This biogas project at SPM Farm is located at Pak Thor District, Ratchaburi Province, Thailand. The project consists of a high-rate continuous flow closed anaerobic treatment reactor to treat the barn flushing effluents produced by SPM’s swine rearing operations.

1300

155 MW Gas based combined cycle power project at Hazir…

From USD 2.15 Available tonnes: 240,307
The purpose of the project activity is to set up a natural gas based combined cycle power plant (CCPP) through a special purpose vehicle Bhander Power Limited (BPL).

8269

LFG flaring project at Dubai, UAE

From USD 40.00 Available tonnes: 994
The UAE and the Gulf Cooperation Council (GCC) are still land filling their waste. The UAE and the Gulf Cooperation Council (GCC) are still land filling their waste .The CH4 Methane emitted by landfills is a Greenhouse Gas (GHG), 27 times more harmful than CO2. Green Energy Solutions & Sustainability LLC is degassing t…

4744

BRT Zhengzhou, China

From USD 5.00 Available tonnes: 7,138
Bus Rapid Transit Zhengzhou is a modern bus-based mass transit system. The project features the largest fleet of hybrid and electric buses worldwide with more than 3.100 units. The project includes 100 km of bus-only lanes, an integrated smart ticketing system, and real-time information of customers.