United Nations

Carbon offset platform

  • Log in
  • Register
  • 0 t
  • Log in
  • Register
  • 0 t
  • About offsetting
  • How to offset
  • UN certification
  • Projects
  • Contributors
  • FAQ
  • Languages EN
    • English [EN]
    • Français [FR]
    • Español [ES]
Filters
  • Clear all filters
  • Project type
    • Agriculture
    • Biogas Energy
    • Biomass energy
    • EE households
    • EE industry
    • Fossil fuel switch
    • Hydro
    • N2O
    • Reforestation and Afforestation
    • Solar
    • Transport
    • Waste handling and disposal
    • Wind
  • Continent Asia
  • Country
    • Argentina
    • Azerbaijan
    • Brazil
    • Cambodia
    • Chile
    • China
    • Costa Rica
    • El Salvador
    • Ghana
    • Guatemala
    • India
    • Jamaica
    • Kenya
    • Korea
    • Malawi
    • Mongolia
    • Pakistan
    • Peru
    • Philippines
    • Rwanda
    • South Africa
    • Sri Lanka
    • Thailand
    • Uganda
    • United Arab Emirates
    • Zimbabwe
  • Co-Benefits Education
  • Vintage
    • CP1: 2008-2012
    • CP2: 2013 or later
  • Payment Method
    • Bank transfer
    • PayPal or Credit Card
Sort by
  • Random
  • Price ascending
  • Price descending
  • Avail. tonnes ascending
  • Avail. tonnes descending
Clear all filters Asia Education

7980

Burgos Wind Project

From USD 4.50 Available tonnes: 27,043
The Burgos Wind Project is the largest wind farm in the Philippines. At the time it was built in 2014, it was also considered to be one of the largest wind farms in South East Asia. It is located in one of the best areas in the country to generate clean energy from wind. The 150-MW facility has fifty (50) Vestas V90 wind…

3531

Adavikanda, Kuruwita Division Mini Hydro Power Project

From USD 6.15 Available tonnes: 20,509
Alternate Power Systems Pvt. Ltd. has constructed a run-of-river 6.5 MW mini hydropower plant in Sri Lanka. The project activity involves generation of up to 20,000 MWh clean electricity annually from a small-scale hydropower plant. The generated power is then supplied to the Sri Lankan national utility grid.

4744

BRT Zhengzhou, China

From USD 5.00 Available tonnes: 4,955
Bus Rapid Transit Zhengzhou is a modern bus-based mass transit system. The project features the largest fleet of hybrid and electric buses worldwide with more than 3.100 units. The project includes 100 km of bus-only lanes, an integrated smart ticketing system, and real-time information of customers.

328

Dolowal, Salar and Bhanubhura Mini Hydroelectric Proje…

From USD 3.50 Available tonnes: 3,929
Three Mini Hydroelectric Projects (MHP) aggregating to 4.2 MW at Dolowal, Salar and Bhanubhura on the Kotla Branch Canal, District Sangrur, Punjab, India was commissioned in April 2003. The plants are operating successfully since then.

United Nations

Framework Convention on
Climate Change

  • Privacy notice
  • Conditions of Use
  • Contact us

United Nations online platform for voluntary cancellation of certified emission reductions (CERs)

2023 United Nations Framework Convention on Climate Change