1265

Chile: Quilleco Hydroelectric Project

From USD 5.00 Available tonnes: 19,910
Quilleco is a run-of-river hydroelectric plant with an effective installed capacity of 70 MW, which uses the waters of the Laja River Basin to deliver energy to the National Electrical System equivalent to the consumption of more than 162,000 people.

6848

Chacayes Hydroelectric Project, Chile

From USD 2.50 Available tonnes: 8,359
Chacayes run of river hydro project is a 111 MW power plant located in the Cachapoal Valley of Chile. Operating since 2011, it has played an important role meeting country’s increasing demand of electricity, reducing CO2 emissions and contributing to the economic growth and sustainable development of local communities.

6973

San Antonio El Sitio Wind Power Project

From USD 1.80 Available tonnes: 97,156
San Antonio El Sitio Wind Power Project is the first wind project located in the Guatemalan region. This project was executed by a Guatemalan firm, Eólico San Antonio El Sitio, and deploys sixteen 3.45 MW units of wind Turbine Generators for an annual average of 135.655 GWh of green electricity to the regional grid, meetin…

4800

San Clemente Hydroelectric Power Plant

From USD 5.00 Available tonnes: 8,420
San Clemente is a run of the river hydroelectric power plant of 5.5 MW of installed capacity, located in Maule Region, Chile. It supplies the electricity demand of over 4,000 people. The project developer, Colbún S.A., works closely with the neighboring communities to create shared value, promoting education and transferri…

4988

El General Hydroelectric Project

From USD 1.00 Available tonnes: 2,892
El General Hydroelectric Project (EGHP) is a hydro power plant consisting of two turbines with a combined capacity of 40 MW, and an average annual net generation of approximately 198,380 MWh.

2793

Santana I SHP CDM Project (JUN 1118)

From USD 1.50 Available tonnes: 57,875
The project generates electricity from a renewable source. Unlike large hydroelectric facilities, Sanatana I, a plant with an installed capacity of 14.75 MW, has virtually no environmental impact. This project uses natural resources efficiently and contributes to sustainable development in Brazil.