1366

Biomass generation project, in Sheyang county, Jiangsu…

From USD 0.50 Available tonnes: 98,784
This project is a biomass power generation initiative located in Sheyang County, Jiangsu Province, China. The plant uses local biomass residues, such as wood, cotton straw, maize straw, rice straw, and other agricultural wastes, as fuel. It has an installed capacity of 30 MW. The project was officially commissioned on Sept…

1268

Tungabhadra wind power project in Karnataka

From USD 1.00 Available tonnes: 142,626
The Project harnesses renewable resources in the region and thereby displacing non-renewable natural resources thereby ultimately leading to sustainable economic and environmental development. The objective is development, design, engineering, procurement, finance, construction, operation and maintenance of Tungabhadra 22.…

1299

Enercon Wind Farms in Karnataka Bundled Project – 33 M…

From USD 0.80 Available tonnes: 10,963
The project activity is designed to provide reliable, renewable energy to the Karnataka state electricity grid, a part of the Indian electricity grid. By displacing electricity from fossil fuel-based generation plants, the project aims to significantly reduce greenhouse gas emissions, mitigating an estimated 71,400 tonnes…

953

Birahi Ganga Hydro Electric Project

From USD 0.50 Available tonnes: 4,086
Birahi Ganga Hydro Electric Project (BGHEP) is a greenfield 3 x 2.4MW run-of-the-river hydroelectric project located in Chamoli District in the state of Uttarakhand in India. The project site is located on the river Birahi approximately 2km eastward of the confluence of two rivers: Birahi river with the Alaknanda river. Th…

958

2 x 5 MW Baner khad & Iku khad small hydroelectric pro…

From USD 0.70 Available tonnes: 98,906
The bundled project activity comprises of two run-of-the river hydroelectric schemes with capacities of 5 MW each. It utilizes surplus hydro potential available in Baner Khad & Iku Khad, both tributaries of the river Beas in the state of Himachal Pradesh, Northern India. It exports the generated electricity to the Himachal…

2365

13.95 MW grid connected wind electricity generation by…

From USD 1.30 Available tonnes: 30,703
The project is spread across two locations – Radhapuram and VK Pudur Taluk, both in Tirunelveli District in Tamil Nadu, India. It involves 6 Wind Turbine Generators (WTGs) where 3 WTGs are of Suzlon and 3 WTGs of Vestas ,with internal electrical lines connecting the project with the local evacuation facility. The project i…

1836

Poechos II hydroelectric plant project

From USD 2.10 Available tonnes: 81,559
The purpose of the Poechos II hydroelectric power plant is to generate electricity, utilizing renewable energy sources to be supplied to the Peruvian National Inter-connected Electric Grid (SEIN).

1835

Jradzor Small Hydroelectric CDM project

From USD 1.00 Available tonnes: 33,335
The Jradzor Small Hydroelectric Project is a pioneering initiative located in the pristine landscapes of Armenia, designed to harness the power of the Jradzor River to generate clean, renewable electricity. This project is a vital contributor to reducing Armenia’s reliance on fossil fuels, generating over 20 million kilowa…