United Nations
Carbon offset platform
Log in
Register
0 t
Log in
Register
0 t
Search
About offsetting
How to offset
UN certification
Projects
Contributors
FAQ
Languages
EN
English [EN]
Français [FR]
Español [ES]
Search
Filters
Filters
Clear all filters
Project type
Project type
Agriculture
Biogas Energy
Biomass energy
EE households
EE industry
Fossil fuel switch
Hydro
N2O
Reforestation and Afforestation
Solar
Transport
Waste handling and disposal
Wind
Continent
Continent
Africa
Asia
Europe
Latin America & the Caribbean
Country
Country
Argentina
Armenia
Azerbaijan
Bhutan
Brazil
Cambodia
Chile
China
Costa Rica
El Salvador
Ghana
Guatemala
India
Kenya
Korea
Malawi
Mexico
Mongolia
Nicaragua
Pakistan
Peru
Philippines
South Africa
Sri Lanka
Thailand
Uganda
United Arab Emirates
Uruguay
Co-Benefits
Co-Benefits
Growth
Vintage
Vintage
CP1: 2008-2012
CP2: 2013 or later
Payment Method
Payment Method
Bank transfer
Sort by
Random
Sort by
Sort by: Sort by
Random
Price ascending
Price descending
Avail. tonnes ascending
Avail. tonnes descending
Clear all filters
Growth
Bank transfer
3833
KOWEPO SMALL HYDROELECTRIC CDM PROJECT IN TAEAN
From USD 0.98
Available tonnes: 18,607
The purpose of the project “KOWEPO Small hydroelectric CDM Project in Taean” is to generate hydroelectric power by using the net head of cooling water drained into the sea. KOWEPO has established small hydro generators that uses sea water as cooling water and returns it into the sea.
3248
Bundled Waste Processing Facilities in India
From USD 1.00
Available tonnes: 244,480
The Bundled Waste Processing Facilities project is a pioneering initiative in India’s journey toward sustainable waste management. Operated by IL&FS Environmental Infrastructure Services Limited, this project process capacity of 600 tons of municipal solid waste (MSW) daily across three composting plants located in Punjab…
2470
Upgradation, Operation and Maintenance of 200 TPD Comp…
From USD 1.00
Available tonnes: 529
The Okhla Compost Plant is a part of the Integrated Scientific Waste Management Scheme of Delhi. It processes over 200 tons of waste from dumpsites every day. The compost produced in the plant is used by local farmers to rejuvenate the soil, that has been affected due to overuse of chemical fertilizers.
5821
Clean Energy generation from wind energy in the state…
From USD 0.80
Available tonnes: 38,352
Project CDM 5821, undertaken by Vish Wind Infrastructure LLP, is a significant initiative generating clean and sustainable wind power for Andhra Pradesh, India. The project consists of a total installed capacity of 6.4 MW. The project is located in Petnikota village in Kurnool district, Andhra Pradesh, India and it utiliz…
5794
Grid Connected Wind Power Project by M/s. D. J. Malpan…
From USD 0.59
Available tonnes: 9,806
The proposed project activity involves grid-connected wind power generation in Jaisalmer District, Rajasthan, India. Developed and owned by M/s. D. J. Malpani, the project comprises five Wind Turbine Generators (WTGs) of 1.5 MW each, with a total installed capacity of 7.5 MW. As a Type I Small-Scale CDM project, the total…
5461
Fatima N2O Abatement Project
From USD 5.50
Available tonnes: 2,951
N₂O Abatement at Fatima Fertilizer’s Nitric Acid Plant in Pakistan: A Benchmark for High-Quality Carbon Offsetting (BeZero Carbon Rating: A) This outstanding project reduces nitrous oxide (N₂O) emissions at the nitric acid plant of Fatima Fertilizer Ltd. in Pakistan and sets a new benchmark in emission reduction. By ins…
4964
Bundled Wind Power Project in Jamnagar, Gujarat
From USD 1.00
Available tonnes: 6,212
Project CDM 4964, a joint initiative by Vish Wind Infrastructure LLP and J. N. Investment & Trading Co. Private Limited, is a bundled project activity that generates electricity for the state grid of Gujarat. This project helps reduce the energy demand-supply gap in the state and contributes to sustainable growth by provid…
4920
4.5 MW wind power project of PCI Limited at Gujarat, I…
From USD 0.30
Available tonnes: 35,515
The proposed CDM project activity involves the installation and operation of three Wind Electricity Generators (WEGs), each with a capacity of 1.5 MW, resulting in a total wind power generation capacity of 4.5 MW. These WEGs are strategically located in the Surajbari Creek, Village Jangi, Bhachau Taluka, Kutch District, Gu…
1
2
3
4
5
Next
Cookies help us deliver our services. By using our services, you agree to our use of cookies.
OK
Learn more