198

San Jacinto Tizate geothermal project

From USD 3.00 Available tonnes: 16,812
Polaris Renewable Energy Inc. ("Polaris") is dedicated to the acquisition, development, and operation of renewable energy projects in Latin America. As a high-performing and financially sound company, we are a key contributor to the energy transition. Our commitment to sustainability is deeply embedded in our business stra…

8204

8 de Agosto

From USD 3.00 Available tonnes: 20,000
Polaris Renewable Energy Inc. (“Polaris”) is a company committed to the acquisition, development and operation of renewable energy projects in Latin America. Polaris is a high-performing and financially sound contributor to the energy transition. Our commitment to sustainability is rooted in our business strategy and corpo…

6573

Caixa Econômica Federal Solid Waste Management and Car…

From USD 3.00 Available tonnes: 34,187
The Caixa Econômica Federal Solid Waste Management and Carbon Finance Project aims to reduce methane emissions from municipal landfills in Brazil. Led by Caixa Econômica Federal, a Brazilian public bank with a mission to “be the public financial institution that fosters inclusion and sustainable development, transforming p…

1836

Poechos II hydroelectric plant project

From USD 2.10 Available tonnes: 81,559
The purpose of the Poechos II hydroelectric power plant is to generate electricity, utilizing renewable energy sources to be supplied to the Peruvian National Inter-connected Electric Grid (SEIN).

6715

Chancay Hydroelectric Power Plant

From USD 2.10 Available tonnes: 102,368
The Chancay Hydroelectric Power Plant is a run-of river reservoir hydroelectric power plant located in Peru, in the district of San Miguel de Acos, province of Huaral, and department of Lima. The purpose of HPP Chancay is to generate electricity using renewable energy sources to be supplied to Peru’s National Interconnect…

86

Poechos I Project

From USD 2.10 Available tonnes: 158,474
The Project is developed in a hydroelectric power plant located in Peru, in the North-western Department of Piura and has an installed capacity and projected yearly average generation of 15.2 MW and 57,740 MWh. The Project is expected to displace 31,463 tCO2e per year.