86

Poechos I Project

From USD 2.10 Available tonnes: 158,474
The Project is developed in a hydroelectric power plant located in Peru, in the North-western Department of Piura and has an installed capacity and projected yearly average generation of 15.2 MW and 57,740 MWh. The Project is expected to displace 31,463 tCO2e per year.

1836

Poechos II hydroelectric plant project

From USD 2.10 Available tonnes: 80,987
The purpose of the Poechos II hydroelectric power plant is to generate electricity, utilizing renewable energy sources to be supplied to the Peruvian National Inter-connected Electric Grid (SEIN).

6715

Chancay Hydroelectric Power Plant

From USD 2.10 Available tonnes: 98,759
The Chancay Hydroelectric Power Plant is a run-of river reservoir hydroelectric power plant located in Peru, in the district of San Miguel de Acos, province of Huaral, and department of Lima. The purpose of HPP Chancay is to generate electricity using renewable energy sources to be supplied to Peru’s National Interconnect…

6328

National Solar Power Development Programme, India

From USD 2.10 Available tonnes: 4,891
This Programme of Activities (PoA) generates solar power which is supplied to the grid system of India. The PoA’s objective is to develop a carbon platform for overcoming hurdles encountered during implementation of small-scale solar power projects in India. The project activities under this PoA are the first of their kind…

6315

Biomass based power project by Harinagar Sugar Mills L…

From USD 2.00 Available tonnes: 21,603
This project, developed by Harinagar Sugar Mills Ltd., is based in a sugar factory in Harinagar, West Champaran district, Bihar, India. The purpose of the project activity is to generate electricity by the combustion of bagasse which is a carbon neutral fuel.

6553

CGR Guatapara Landfill Project

From USD 2.00 Available tonnes: 44,627
The CGR Guatapará Landfill Project, located in Guatapará, São Paulo, Brazil, is a large-scale environmental initiative that captures and utilizes landfill gas (LFG), primarily methane, generated from the decomposition of municipal solid waste. Methane is a potent greenhouse gas, and if left unmanaged, it would escape into…

7099

Bundled wind Project by Premier Mills, Pushpathur, Din…

From USD 2.00 Available tonnes: 5
The Premier Group has an international reputation for quality and innovation built over the past 60 years in the textile industry. Three separate entities under the Premier Group have developed a 24 MW wind farm in the state of Tamil Nadu, India. The purpose of the project activity is to utilize renewable wind energy for g…

8039

Yeongam F1 Circuit Photovoltaic Power Plant CDM projec…

From USD 1.50 Available tonnes: 92,430
The purpose of the Yeongam F1 Circuit Photovoltaic Power Plant CDM project is to supply electricity to KEPCO (Korea Electric Power Company) by generating electricity using photovoltaic technology. The project is under construction at the F1 circuit parking lot in Yeong’am-gun, Jeollanam-do, Republic of Korea.