958

2 x 5 MW Baner khad & Iku khad small hydroelectric pro…

From USD 0.70 Available tonnes: 86,428
The bundled project activity comprises of two run-of-the river hydroelectric schemes with capacities of 5 MW each. It utilizes surplus hydro potential available in Baner Khad & Iku Khad, both tributaries of the river Beas in the state of Himachal Pradesh, Northern India. It exports the generated electricity to the Himachal…

818

MSPSPL Waste Heat Recovery Based Captive Power Project

From USD 0.45 Available tonnes: 97,338
MSP Steel & Power Limited (MSPSPL) is a greenfield integrated steel complex involved in the manufacture of sponge iron, billet castings and TMT bars in the state of Chhattisgarh, India. The traditional pollution control method of dealing with the waste gas stream is through installation of a wet scrubbing system which has…

1300

155 MW Gas based combined cycle power project at Hazir…

From USD 1.10 Available tonnes: 7,766
The purpose of the project activity is to set up a natural gas based combined cycle power plant (CCPP) through a special purpose vehicle Bhander Power Limited (BPL).

1366

Biomass generation project, in Sheyang county, Jiangsu…

From USD 0.50 Available tonnes: 98,315
This project is a biomass power generation initiative located in Sheyang County, Jiangsu Province, China. The plant uses local biomass residues, such as wood, cotton straw, maize straw, rice straw, and other agricultural wastes, as fuel. It has an installed capacity of 30 MW. The project was officially commissioned on Sept…

1299

Enercon Wind Farms in Karnataka Bundled Project – 33 M…

From USD 0.41 Available tonnes: 971
The project activity is designed to provide reliable, renewable energy to the Karnataka state electricity grid, a part of the Indian electricity grid. By displacing electricity from fossil fuel-based generation plants, the project aims to significantly reduce greenhouse gas emissions, mitigating an estimated 71,400 tonnes…

1268

Tungabhadra wind power project in Karnataka

From USD 1.00 Available tonnes: 142,626
The Project harnesses renewable resources in the region and thereby displacing non-renewable natural resources thereby ultimately leading to sustainable economic and environmental development. The objective is development, design, engineering, procurement, finance, construction, operation and maintenance of Tungabhadra 22.…

1835

Jradzor Small Hydroelectric CDM project

From USD 0.60 Available tonnes: 26,067
The Jradzor Small Hydroelectric Project is a pioneering initiative located in the pristine landscapes of Armenia, designed to harness the power of the Jradzor River to generate clean, renewable electricity. This project is a vital contributor to reducing Armenia’s reliance on fossil fuels, generating over 20 million kilowa…

1836

Poechos II hydroelectric plant project

From USD 2.10 Available tonnes: 80,987
The purpose of the Poechos II hydroelectric power plant is to generate electricity, utilizing renewable energy sources to be supplied to the Peruvian National Inter-connected Electric Grid (SEIN).