165

ESTRE’s Paulínia Landfill Gas Project (EPLGP)

From USD 2.00 Available tonnes: 50,000
The Paulínia Landfill Gas Project, located in São Paulo, Brazil, is an initiative by ESTRE Ambiental S/A that significantly improves waste management practices while fighting climate change. The project captures methane gas—a highly potent greenhouse gas—produced from the natural decomposition of organic waste in landfills…

8204

8 de Agosto

From USD 3.00 Available tonnes: 50,000
Polaris Renewable Energy Inc. (“Polaris”) is a company committed to the acquisition, development and operation of renewable energy projects in Latin America. Polaris is a high-performing and financially sound contributor to the energy transition. Our commitment to sustainability is rooted in our business strategy and corpo…

1836

Poechos II hydroelectric plant project

From USD 2.10 Available tonnes: 80,987
The purpose of the Poechos II hydroelectric power plant is to generate electricity, utilizing renewable energy sources to be supplied to the Peruvian National Inter-connected Electric Grid (SEIN).

9375

Corredor dos Senandes CDM Project

From USD 1.20 Available tonnes: 96,201
The Corredor dos Senandes CDM Project, located in Rio Grande do Sul, in southern Brazil, involves the development and operation of the Corredor dos Senandes wind power complex, comprising four wind power plants (WPPs) on the same site. The project has a total installed capacity of 108 MW. Each wind turbine has a unitary in…

6715

Chancay Hydroelectric Power Plant

From USD 2.10 Available tonnes: 99,638
The Chancay Hydroelectric Power Plant is a run-of river reservoir hydroelectric power plant located in Peru, in the district of San Miguel de Acos, province of Huaral, and department of Lima. The purpose of HPP Chancay is to generate electricity using renewable energy sources to be supplied to Peru’s National Interconnect…

86

Poechos I Project

From USD 2.10 Available tonnes: 158,474
The Project is developed in a hydroelectric power plant located in Peru, in the North-western Department of Piura and has an installed capacity and projected yearly average generation of 15.2 MW and 57,740 MWh. The Project is expected to displace 31,463 tCO2e per year.