9375

Corredor dos Senandes CDM Project

From USD 1.80 Available tonnes: 99,950
The Corredor dos Senandes CDM Project, located in Rio Grande do Sul, in southern Brazil, involves the development and operation of the Corredor dos Senandes wind power complex, comprising four wind power plants (WPPs) on the same site. The project has a total installed capacity of 108 MW. Each wind turbine has a unitary in…

7099

Bundled wind Project by Premier Mills, Pushpathur, Din…

From USD 2.00 Available tonnes: 10
The Premier Group has an international reputation for quality and innovation built over the past 60 years in the textile industry. Three separate entities under the Premier Group have developed a 24 MW wind farm in the state of Tamil Nadu, India. The purpose of the project activity is to utilize renewable wind energy for g…

7844

5.30 MW Bundled Wind Power Project in India

From USD 2.00 Available tonnes: 12,784
The project activity is a bundled wind power project of capacity 5.3 MW installed in the states of Madhya Pradesh, Maharashtra and Rajasthan in India. The project activity supplies electricity to the Indian grid. The total installed capacity of the project activity is 5.30 MW. The project activity uses wind energy to produ…

6715

Chancay Hydroelectric Power Plant

From USD 2.10 Available tonnes: 100,468
The Chancay Hydroelectric Power Plant is a run-of river reservoir hydroelectric power plant located in Peru, in the district of San Miguel de Acos, province of Huaral, and department of Lima. The purpose of HPP Chancay is to generate electricity using renewable energy sources to be supplied to Peru’s National Interconnect…

6328

National Solar Power Development Programme, India

From USD 2.10 Available tonnes: 5,382
This Programme of Activities (PoA) generates solar power which is supplied to the grid system of India. The PoA’s objective is to develop a carbon platform for overcoming hurdles encountered during implementation of small-scale solar power projects in India. The project activities under this PoA are the first of their kind…

1836

Poechos II hydroelectric plant project

From USD 2.10 Available tonnes: 81,559
The purpose of the Poechos II hydroelectric power plant is to generate electricity, utilizing renewable energy sources to be supplied to the Peruvian National Inter-connected Electric Grid (SEIN).

86

Poechos I Project

From USD 2.10 Available tonnes: 158,474
The Project is developed in a hydroelectric power plant located in Peru, in the North-western Department of Piura and has an installed capacity and projected yearly average generation of 15.2 MW and 57,740 MWh. The Project is expected to displace 31,463 tCO2e per year.

5977

Salkhit Wind Farm

From USD 2.23 Available tonnes: 3,215
The Salkhit Wind Farm is the first grid connected wind farm in Mongolia. The project generates renewable electricity using wind power resources and supplies it to the Mongolian central electricity system grid to meet the growing electricity demand.