United Nations
Carbon offset platform
Log in
Register
0 t
Log in
Register
0 t
Search
About offsetting
How to offset
UN certification
Projects
Contributors
FAQ
Languages
EN
English [EN]
Français [FR]
Español [ES]
Search
Filters
Filters
Clear all filters
Project type
Project type
Agriculture
Biogas Energy
Biomass energy
EE households
EE industry
Fossil fuel switch
Hydro
N2O
Reforestation and Afforestation
Solar
Transport
Waste handling and disposal
Wind
Continent
Continent
Africa
Asia
Europe
Latin America & the Caribbean
North America
Country
Country
Argentina
Armenia
Azerbaijan
Bhutan
Brazil
Cambodia
Chile
China
Colombia
Costa Rica
El Salvador
Ghana
Guatemala
India
Jamaica
Kenya
Korea
Malawi
Mexico
Mongolia
Nicaragua
Pakistan
Peru
Philippines
South Africa
Sri Lanka
Thailand
Uganda
United Arab Emirates
Uruguay
Zimbabwe
Co-Benefits
Co-Benefits
Air
Land
Water
Natural resources
Jobs
Health & Safety
Education
Welfare
Growth
Energy
Technology
Balance of payments
Vintage
Vintage
CP1: 2008-2012
CP2: 2013 or later
Payment Method
Payment Method
PayPal or Credit Card
Sort by
Avail. tonnes ascending
Sort by
Sort by: Sort by
Random
Price ascending
Price descending
Avail. tonnes ascending
Avail. tonnes descending
Clear all filters
PayPal or Credit Card
5344
Electricity Generation through Wind Power by SRHHL
From USD 0.45
Available tonnes: 19
The project activity consists of setting up of Wind Turbine Generators (WTG) of a total capacity of 4.95 MW (1.65 MW x 3 nos.) in Tamil Nadu by Sree Rayalaseema Hi-Strength Hypo Limited, (hereafter referred as SRHHL).
889
RIMA Fuel Switch in Bocaiúva
From USD 0.50
Available tonnes: 510
The project resides in the industrial district of Bocaiúva, in the northern state of Minas Gerais, a region dedicated to metallurgy, mining, agriculture and reforestation. The project replaces fossil fuel by renewable biomass at one of the factories of Rima Industrial.
4489
Wind Energy Project in Maharashtra by M/s Shah Promote…
From USD 5.00
Available tonnes: 791
Our 7.2 Mw wind farm is located at Khandke, India. The project developer is the firm M/s Shah Promoters & Developers. In addition to the production of green energy, this project creates employment, business and extra income opportunities for the locals.
7359
PoA for the Reduction of emission from non-renewable f…
From USD 30.00
Available tonnes: 1,095
The purpose of this project is to reduce emissions from household cooking stoves. The use of non-renewable fuel such as wood and charcoal for cooking, leads to the emission of greenhouses gasses, deforestation and poor indoor climate. The programme uses a number of different technologies to reach this goal.
8438
Clean Cook Stoves in Sub-Saharan Africa by ClimateCare…
From USD 10.00
Available tonnes: 1,876
CookClean manufactures efficient cookstoves to displace the resources wasteful and unhealthy traditional stoves which kill 13,400 people and subject 21 million to Household Air Pollution yearly in Ghana.
7844
5.30 MW Bundled Wind Power Project in India
From USD 2.75
Available tonnes: 2,000
The project activity is a bundled wind power project of capacity 5.3 MW installed in the states of Madhya Pradesh, Maharashtra and Rajasthan in India. The project activity supplies electricity to the Indian grid. The total installed capacity of the project activity is 5.30 MW. The project activity uses wind energy to produ…
557
Catalytic N2O Abatement Project in the Tail Gas of the…
From USD 4.65
Available tonnes: 2,077
The aim of this project is to reduce nitrous oxide (N2O) emissions in the tail gas of the nitric acid plant of Pakarab Fertilizer Ltd. N2O is an undesired by-product in the production process of nitric acid, which was normally released to the atmosphere.
1541
10 MW Biomass Based Renewable Energy Generation for th…
From USD 3.50
Available tonnes: 2,707
Saradambika is a 10 MW Biomass Power Plant located in Chimur, India. The project conserves local resources, reduces pressure on the environment, and improves health conditions in the community. The emissions reductions of the project are estimated at 353,487 tonnes of CO2 eq. over the crediting period of 10 years.
1
2
3
4
5
Next