Industry
  • Wind
Continent
  • Asia
Country
  • India
Vintage
  • CP1: 2008-2012
  • CP2: 2013 or later
Sustainable Development Co-Benefits
Environmental
  • Air
  • Natural resources
Social
  • Jobs
  • Welfare
Economic
  • Energy
  • Technology
Recent project contributors
11/28/2023GB5 t
11/13/2023CN309 t
11/6/2023ES40 t
10/23/2023GB20 t
10/19/2023IT1,200 t
View all 25

7099

Bundled wind Project by Premier Mills, Pushpathur, Dindugal, Tamil Nadu

25

The Premier Group has an international reputation for quality and innovation built over the past 60 years in the textile industry. Three separate entities under the Premier Group have developed a 24 MW wind farm in the state of Tamil Nadu, India. The purpose of the project activity is to utilize renewable wind energy for generation of electricity with an aggregated capacity of 24 MW.
CP1

USD 1.50 per tonne

Serial numberIN: 300042838 - 300049396
Monitoring period04-09-2012 - 31-12-2018
Applicable tax rate0 %
ProviderEKI Energy Services Ltd.
Availability1,553 tonne(s)
This product has a minimum quantity of 5
CP2

USD 2.00 per tonne

Serial numberIN: 300035398 - 300042703
Monitoring period04-09-2012 - 31-12-2018
Applicable tax rate0 %
ProviderEKI Energy Services Ltd.
Availability4,200 tonne(s)