The main purpose of the project activity is to generate electrical energy through sustainable means using wind power resources and to contribute to climate change mitigation efforts. The electricity generated is supplied to the INDIAN grid.
In the absence of the project activity, the electricity thus supplied would have been generated by GHG intensive fossil fuel based thermal power plants. The project activity contributes to sustainable social and economic well-being along with conservation of environment through use of wind as a renewable source.
Sahyadri Industries Ltd. has ventured into renewable energy generation with the installation of six wind mills, of which four are in Rajasthan and 2 in Tamil Nadu, having a total capacity of 4.8 MW.