4309

Balsio Small Hydroelectric Project of Ginni Global Pvt…

From USD 2.50 Available tonnes: 199,886
The purpose of the project activity is Hydro power generation on Balsio Nallah, a perennial tributary of Baira Nallah in the Ravi Basin by Ginni Global Pvt. Ltd. (GGPL).

376

Taraila Small Hydroelectric Project of Ginni Global Lt…

From USD 2.50 Available tonnes: 78,194
The purpose of the project activity is to generate electricity by using the renewable hydraulic resources to meet the ever-increasing demand for energy in the region.

3309

Sichuan Muchuan County Huogu Hydropower Project

From USD 2.95 Available tonnes: 33,804
The objective of the project is the generation of zero carbon emission electricity from a renewable source - hydropower.

7152

Sichuan Da County Jiujietan Hydropower Project

From USD 3.20 Available tonnes: 31,907
Sichuan Da County Jiujietan Hydropower Project is located upstream of Shiti Town Da County Dazhou City, Sichuan province. The project is a run-of-river hydropower plant which uses hydro potential available in the Ba River to generate electricity.

7497

Xinjiang A’letai Hua’ning Hydropower Project

From USD 2.80 Available tonnes: 27,978
The objective of the project is the generation of zero carbon emission electricity from hydropower and the displacement of the same amount of electricity from the Northwest China Power Grid (NWPG) that is mainly dominated by electricity derived from coal-fired power plants.

7507

Qinghai Maqin Gequ Level 2 Hydropower Station

From USD 3.20 Available tonnes: 13,370
The Qinghai Maqin Gequ Level 2 hydropower station generates zero-green gas emission electricity through the application of hydropower and displaces the same amount of electricity from the Northwest China Power Grid (NWPG) that is mainly dominated by electricity derived from coal-fired power plants.

329

Babanpur, Killa and Sahoke Mini Hydroelectric Projects

From USD 5.25 Available tonnes: 12,693
Three Mini Hydroelectric Projects (MHP) aggregating to 3.75 MW at Babanpur, Killa and Sahoke on the Kotla Branch Canal, District Sangrur, Punjab, India have been set up. Mini Hydroelectric Project at Babanpur (1MW) was commissioned in July 2004, Killa (1.75MW) was commissioned in November 2005 and Sahoke (1MW) was commissi…

328

Dolowal, Salar and Bhanubhura Mini Hydroelectric Proje…

From USD 6.15 Available tonnes: 4,412
Three Mini Hydroelectric Projects (MHP) aggregating to 4.2 MW at Dolowal, Salar and Bhanubhura on the Kotla Branch Canal, District Sangrur, Punjab, India was commissioned in April 2003. The plants are operating successfully since then.