6720

Renewable power for sustainable development

From USD 1.00 Available tonnes: 43,104
The main objective of the project activity is to mitigate greenhouse gas (GHG) emissions by energy generation through renewable source namely Wind.

7099

Bundled wind Project by Premier Mills, Pushpathur, Din…

From USD 2.00 Available tonnes: 3,106
The Premier Group has an international reputation for quality and innovation built over the past 60 years in the textile industry. Three separate entities under the Premier Group have developed a 24 MW wind farm in the state of Tamil Nadu, India. The purpose of the project activity is to utilize renewable wind energy for g…

7844

5.30 MW Bundled Wind Power Project in India

From USD 2.00 Available tonnes: 12,784
The project activity is a bundled wind power project of capacity 5.3 MW installed in the states of Madhya Pradesh, Maharashtra and Rajasthan in India. The project activity supplies electricity to the Indian grid. The total installed capacity of the project activity is 5.30 MW. The project activity uses wind energy to produ…

7901

Wind power project in Tamil Nadu by SWPPL

From USD 0.43 Available tonnes: 3,957
The project involves the installation of Suzlon Wind Energy Generators (WEGs) with individual capacities of 1.5 MW and 2.1 MW, located across the Tirunelveli and Tirupur districts in Tamil Nadu, India. The electricity generated will be supplied to the Tamil Nadu Generation and Distribution Corporation Ltd (TANGEDCO) under…

9418

Grid Connected Wind Power Generation in Tamil Nadu, In…

From USD 1.00 Available tonnes: 2,675
The project activity involves installation of 15 wind turbine generators (WTG) in a phased manner in the different districts of Tamil Nadu state by Premier Cotton Textiles (PCT), a partnership firm, and Sree Narasimha Textiles Pvt Ltd (SNT), both belonging to the Premier Group. The cumulative capacity of the WTGs is 24.75…

9330

Bundled Wind Power Project by Gangamai Industries and…

From USD 4.00 Available tonnes: 31,599
This bundled wind power project has an installed capacity of 10.9 MW in the states of Maharashtra and Rajasthan, India. The annual estimated amount of greenhouse gases reductions obtained from the project activity is 17,321 t CO2e. Its developer is Gangamai Industries and Construction Limited.