4964

Bundled Wind Power Project in Jamnagar, Gujarat

From USD 100.00 Available tonnes: 1
Project CDM 4964, a joint initiative by Vish Wind Infrastructure LLP and J. N. Investment & Trading Co. Private Limited, is a bundled project activity that generates electricity for the state grid of Gujarat. This project helps reduce the energy demand-supply gap in the state and contributes to sustainable growth by provid…

9330

Bundled Wind Power Project by Gangamai Industries and…

From USD 4.00 Available tonnes: 32,871
This bundled wind power project has an installed capacity of 10.9 MW in the states of Maharashtra and Rajasthan, India. The annual estimated amount of greenhouse gases reductions obtained from the project activity is 17,321 t CO2e. Its developer is Gangamai Industries and Construction Limited.

6667

4.2 MW Renewable Energy-WIND

From USD 2.50 Available tonnes: 37,600
The project activity comprises of setting up of two number of Wind Electricity Generators (WEGs) with an installed capacity of 4.2 MW (2 x2.1 MW) located in the village of Kurukkalpatti in the district of Tirunelveli.

267

5 MW Wind Power Project at Baramsar and Soda Mada, dis…

From USD 2.00 Available tonnes: 7,675
With over 50 years of experience, Transport Corporation of India Limited is the largest integrated supply chain and logistics solutions provider in India. In 2003, the company entered the energy sector looking to promote non-conventional energy means. Currently, it holds 11.50 MW windmills in Rajasthan and Maharashtra.

5821

Clean Energy generation from wind energy in the state…

From USD 2.00 Available tonnes: 38,574
Project CDM 5821, undertaken by Vish Wind Infrastructure LLP, is a significant initiative generating clean and sustainable wind power for Andhra Pradesh, India. The project consists of a total installed capacity of 6.4 MW. The project is located in Petnikota village in Kurnool district, Andhra Pradesh, India and it utiliz…

7099

Bundled wind Project by Premier Mills, Pushpathur, Din…

From USD 2.00 Available tonnes: 3,212
The Premier Group has an international reputation for quality and innovation built over the past 60 years in the textile industry. Three separate entities under the Premier Group have developed a 24 MW wind farm in the state of Tamil Nadu, India. The purpose of the project activity is to utilize renewable wind energy for g…

7844

5.30 MW Bundled Wind Power Project in India

From USD 2.00 Available tonnes: 12,784
The project activity is a bundled wind power project of capacity 5.3 MW installed in the states of Madhya Pradesh, Maharashtra and Rajasthan in India. The project activity supplies electricity to the Indian grid. The total installed capacity of the project activity is 5.30 MW. The project activity uses wind energy to produ…

2365

13.95 MW grid connected wind electricity generation by…

From USD 1.30 Available tonnes: 30,703
The project is spread across two locations – Radhapuram and VK Pudur Taluk, both in Tirunelveli District in Tamil Nadu, India. It involves 6 Wind Turbine Generators (WTGs) where 3 WTGs are of Suzlon and 3 WTGs of Vestas ,with internal electrical lines connecting the project with the local evacuation facility. The project i…