376

Taraila Small Hydroelectric Project of Ginni Global Lt…

From USD 0.50 Available tonnes: 39,034
The purpose of the project activity is to generate electricity by using the renewable hydraulic resources to meet the ever-increasing demand for energy in the region.

557

Catalytic N2O Abatement Project in the Tail Gas of the…

From USD 4.10 Available tonnes: 11,452
This exceptional project for reducing nitrous oxide (N2O) in the tail gas of the nitric acid plant at Pakarab Fertilizer Ltd. in Multan, Pakistan, sets new standards in emission reduction. The facility has been retrofitted with a state-of-the-art tertiary N2O abatement unit that eliminates up to 90% of this potent greenhou…

86

Poechos I Project

From USD 2.10 Available tonnes: 158,474
The Project is developed in a hydroelectric power plant located in Peru, in the North-western Department of Piura and has an installed capacity and projected yearly average generation of 15.2 MW and 57,740 MWh. The Project is expected to displace 31,463 tCO2e per year.

1279

Fundão-Santa Clara Energetic Complex Project (FSCECP)

From USD 1.00 Available tonnes: 13,866
The objective of the project is the generation of zero carbon emission electricity from a renewable source - hydropower.

1268

Tungabhadra wind power project in Karnataka

From USD 1.00 Available tonnes: 142,626
The Project harnesses renewable resources in the region and thereby displacing non-renewable natural resources thereby ultimately leading to sustainable economic and environmental development. The objective is development, design, engineering, procurement, finance, construction, operation and maintenance of Tungabhadra 22.…

1366

Biomass generation project, in Sheyang county, Jiangsu…

From USD 0.50 Available tonnes: 98,736
This project is a biomass power generation initiative located in Sheyang County, Jiangsu Province, China. The plant uses local biomass residues, such as wood, cotton straw, maize straw, rice straw, and other agricultural wastes, as fuel. It has an installed capacity of 30 MW. The project was officially commissioned on Sept…

1300

155 MW Gas based combined cycle power project at Hazir…

From USD 1.10 Available tonnes: 9,763
The purpose of the project activity is to set up a natural gas based combined cycle power plant (CCPP) through a special purpose vehicle Bhander Power Limited (BPL).

818

MSPSPL Waste Heat Recovery Based Captive Power Project

From USD 0.45 Available tonnes: 97,504
MSP Steel & Power Limited (MSPSPL) is a greenfield integrated steel complex involved in the manufacture of sponge iron, billet castings and TMT bars in the state of Chhattisgarh, India. The traditional pollution control method of dealing with the waste gas stream is through installation of a wet scrubbing system which has…